ExxonMobil’s Polypropylene Growth Project (PPG) is a world-class impact copolymer plant that used the latest technology during its four-year construction phase.
Idaho’s first dedicated industrial complex consists of six concrete tilt-up warehouses with 32-ft clearances and 52-ft column spacing, offering tenants maximum flexibility.
Built on a greenfield site in Columbia, Mo., the 315,000-sq-ft Swift Prepared Foods facility produces a variety of dried meats, including salami, pepperoni, prosciutto, pancetta and coppa.
Turkey-based Sabachi Renewables is building its third clean energy project in the state, while Longroad hires McCarthy for Arizona solar-battery project
To help reduce Tampa Electric’s carbon footprint, the company launched a project to modernize a 50-year-old coal-fired power station and create a new combined-cycle facility capable of producing 1,090 MW.
Spanning nearly 1,400 acres, the 275-MW solar farm and 75-MW battery storage system stands as a testament both to renewable energy and respect for the land and people of the Moapa Band of Paiute Indians.
Encompassing nearly 300,000 sq ft on a 70-acre site, the three-building aluminum remelt and extrusion complex allows scrap metal to be remelted into 24-ft-long billets ranging in diameter from 7 to 18 in.
The two-year program was designed to ensure Baltimore Gas & Electric (BG&E) will continue to deliver safe and reliable power to more than a million customers in the Baltimore region for the next 75 years.