This critical dam infrastructure upgrade, located 200 ft down a spillway tunnel at a sustained 52-degree slope within Round Butte Dam, is only the fifth retrofit concrete tunnel aerator constructed in the U.S.
After sitting vacant for decades, this adaptive reuse project transformed a 121-year-old school into a mixed-use community hub while preserving its historic character.
Working within a 14-day window, and culminating in a planned 96-hour complete halt of train operations, the team successfully replaced a 70-year-old structurally deficient bridge located along a remote section of a critical cross-border freight rail route.
As part of an effort to enhance the CDC’s ability to monitor and respond to international health concerns, an existing airside building was transformed into a facility that combines precision engineering with thoughtful design.
Transforming the interior and exterior of this boutique on Rodeo Drive required real-time problem solving, coordination and flexibility throughout all phases.