Challenges in constructing Hill View House started right from the beginning. The house was designed to be built on a slope, and finding a contractor with experience in slope construction proved difficult.
As a year-round learning center, this 6,450-sq-ft facility will help visitors reconnect with nature, learn about the Salt Lake Valley’s agricultural heritage and provide opportunities to learn about historic farming practices through hands-on experiences.
A sophisticated surgery suite outfitted with multiple types of imaging technology will allow surgeons to use these additional resources while a procedure is underway to help guide decisions and strategies in real time.
When this animal shelter was experiencing capacity issues and needed renovations and additions, the Humane Society turned to GE Johnson without a bidding process thanks to an already established relationship from a past renovation and ongoing volunteer work.
This $5.8-million design-build project transformed an aging 1960s-era weight room in the north lower level of the Moby Arena Complex into a new 8,400-sq-ft locker room for Colorado State University’s basketball teams.
Constructing a building for gene therapy biotech firm bluebird bio required a collaborative, fast-track approach that allowed for quick decision-making.
Located on the first floor and basement level of an existing Manhattan building, the state-of-the-art outpatient ambulatory specialized care facility features cutting-edge CT scan equipment to expedite examination of possible cardiac conditions and has advanced surgical equipment for performing emergency procedures.