Red Rock Dam, a U.S. Army Corps of Engineers facility on the Des Moines River near Pella, Iowa, got a new powerhouse courtesy of Stantec’s design and a new generation license from the Federal Energy Regulatory Commission.
The $670-million West Riverside Energy Center (WREC) in Beloit, Wis., provides 730 MW of reliable power. This combined-cycle facility can ramp its output up and down quickly to deal with shortages or surpluses.
The 35,000-sq-ft, 850-seat church utilizes insulated concrete forms (ICF) for the basement and first-level exterior walls, giving the structure increased energy efficiency and added resilience against extreme temperatures and weather events.
The St. Louis Zoo Primate Canopy Trails are home to 40 primates representing 14 different species. When lead design firm PGAV Destinations and general contractor Tarlton Corp. began work on the 35,000-sq-ft expansion to the existing primate house in late 2019, one of their biggest challenges was planning work around chimpanzees, lemurs and colobus monkeys.
With the goal of balancing environmental protection and aviation safety, Short Elliott Hendrickson designed an alternative alignment for the main runway at Duluth Sky Harbor.
This year’s Best Projects contest covered work completed between May 1, 2020, to May 31, 2021. In other words, the period of time that saw the COVID-19 pandemic at its most virulent and impactful to broad sections of the U.S. economy, including the construction industry.
Part of Allen Morris Co.’s live-work-play Star Metals development in Atlanta’s West Midtown district, this nine-story, 675,000-sq-ft mixed-use development was “filled with obstacles,” according to the project team. The hurdles included zero laydown area and the need to remove roughly 15,000 cu yd of rock.