Champions Hall provides the University of Arkansas with more general use classroom and lab space and creates an interactive neighborhood hub and student destination.
Crews working on the Mary Couts Burnett Library renovated 20,000 sq ft of the facility, originally built in 1923, and added 58,000 sq ft of new construction.
The new civil courts building for Tarrant County features an asymmetrical scheme with a public plaza; a six-story, 235,000-sq-ft building; and a 26-car secure, underground parking garage.
The 139,000-sq-ft Dr. Martin Luther King Jr. High School replaced the Alfred Lawless High School, which was heavily damaged by Hurricane Katrina and subsequently demolished.
Hoar Construction led work on a large renovation and expansion at Baybrook Mall, which included a new 285,000-sq-ft lifestyle center, an additional entrance and a 300-space parking garage.
The Elk Station 2 & 3 project involved design and construction of two 380-MW simple-cycle powerplants utilizing two General Electric 7FA.05 combustion turbines with a grid-switching switchyard.