Can Southwest water agencies create a new market for desalinated and recycled water without building pipelines or altering Colorado River water rights?
As Lake Powell and Lake Mead near critical elevations, federal planners face narrowing operational options that could reshape hydropower generation, releases and Colorado River Basin water management.
A draft environmental impact statement by the Bureau of Reclamation outlines post-2026 Colorado River dam operations, assessing coordination, reliability and infrastructure risk in an era of persistent drought.
As Lake Powell drops toward critical thresholds, engineers are making long-term infrastructure decisions even as Colorado River rules remain unresolved.
A bipartisan bill meant to stabilize financing for an active rural water project is vetoed, exposing how late-stage policy shifts can disrupt infrastructure delivery.
Shimmick Construction Co. is general contractor under a $373.8-million design-bid-build contract for San Diego's North City Pure Water Facility and Pump Station—a 30-million-gallon-per-day plant that is part of the Pure Water San Diego Program.