The Maryland Transportation Authority is now evaluating proposals to replace the bridge, which collapsed after it was struck by a cargo vessel in March, with an eye on a possible completion by 2028.
The inadequacy of existing safeguards to protect bridges and other infrastructure from ever-larger container ships was considered in a House hearing May 15, a day after the NTSB released its preliminary report on the collapse of the Francis Scott Key Bridge.