To expand Port Everglades, the facility arranged for the construction of the Southport Turning Notch, a series of five new berths designed to handle the future influx of Super Post Panamax Container cargo ships.
Retrofitting Launch Complex 41 to support the U.S.’s next generation of manned spaceflight systems required some literal and figurative rocket science throughout the project.
Completed ahead of schedule in just 9 months, the $4.65-million Bouhan Falligant office building anchors the south end of Savannah’s Forsyth Park with Chicago-style architecture.
The newly expanded and renovated two-level Longleaf Café and Garden House was designed to seamlessly blend with the surrounding gardens, a feature that also constrained the contractor’s ability to access the site and make the contemporary glass structure a reality.
The 60-story, 132-unit condominium has the distinction of housing a first-of-its-kind automobile elevator lift system that delivers both residents and their vehicles directly to their luxury homes.
In renovating Birmingham’s 1920s-era former Federal Reserve building—and a 1950s-era annex—into commercial office space, the owner tasked the project team with incorporating existing items into the project in order to qualify for historic tax credits from the state of Alabama.
The CityPlace Doral project, developed and owned by Miami’s Related Group, is a 1.2-million-sq-ft multi-use complex consisting of seven different buildings: two residential towers, a 300,000-sq-ft retail center, a 36,000-sq-ft movie theater, two parking garages and a 30,000-sq-ft grocery store.