Component building company Project Frog received an investment last week from software developer Autodesk to create a cloud-based data platform that connects the architectural design process with manufacturing and project delivery.
While augmented reality has been touted as a tool to view 3D models and on-site construction together in context, the size of a 3D model limits its application, especially with headset viewers such as Microsoft HoloLens.
In the wake of Sept. 19’s magnitude-7.1 earthquake that killed at least 369 people in Mexico, geotechnical engineers are calling for routine site-response analyses during design to ensure structures in high seismic zones are not “in tune” with their soil.
With Northern California’s deadly wildfires mostly contained, investigators are moving to preserve evidence in the search for the cause of the blazes. Affected homeowners have filed lawsuits alleging that inadequate power-line maintenance may have played a role.
Though the new chairman of the Federal Energy Regulatory Commission—the agency responsible for approving massive natural-gas pipelines—is making progress clearing a six-month backlog of such projects, he may be hamstrung by procedures put in place by the Obama administration and by at least one fellow commissioner.
In a market in which demand for heavy-lift cranes rises and falls with demand for large power, petrochemical and infrastructure projects, crane manufacturer Sarens is seeing enough consistent interest to warrant construction of the SGC-140, a massive crane even larger than the SGC-120 it introduced in 2011.