The short-term future is bright for contractors, though long-term projections are clouded by economic uncertainty and labor issues, according to industry executives and results from the 2018 Top Contractors survey.
Wet- and dry-side construction activities to fix two frozen valves on a 100-year-old dam are performed with the aid of a floating barge on Watson Lake near Prescott, Ariz.
The 1.1-million-sq-ft First Solar Modular Manufacturing Plant planned for Lake Township, Ohio, will be the single largest thin-film solar module manufacturing facility in the U.S. when it’s completed in late 2019.
The Orange County Sanitation District has hired Black & Veatch to design the overhaul and upgrade of Wastewater Plant No. 2 in Huntington Beach, Calif.