The team preserved historic elements of a 22-ft-long, 60-ft-wide Main Street bridge, built in 1921, and its surroundings, while it minimized shutting down portions of the center of Chester, Conn.
Before its $21-million adaptive reuse project began three years ago, the 132-year-old Richardsonian Romanesque granite and sandstone-trimmed chapel sat vacant for nearly two decades.
The successful razing of the more than 424,000-sq-ft brick library in the center of the Williams College campus depended on the protection of several occupied buildings, each less than 25 ft away.
Halfway through design of the 190,000-sq-ft middle and high school, the Federal Emergency Management Agency released maps that placed the site in the 100-year floodplain.
The rain garden along the undulating wood rain screen at the LEED Gold-certified elementary school—a replacement for the Sandy Hook school where 20 children and six adults were killed nearly five years ago—is a natural filter for roof runoff as well as a tool to teach students about plant and animal ecology.
The interior improvement of Arup’s Boston office is the first project in New England to achieve a WELL Building Standard and the 14th project globally to receive WELL Gold status.