With the successful completion of the $1-billion seawater desalination plant in Carlsbad, Calif., the project’s developer is moving forward with plans to build a second plant at Huntington Beach.
Officials from various water-related entities highlighted some of the problems associated with the historic drought that is plaguing much of the western U.S.—as well as some solutions to address it—at Engineering News-Record’s second annual Western Water Conference.
A Los Angeles car museum gets a renovation to match its collection with a cherry-red exterior and 310 distinct metal panels flowing around it like a fluid-dynamics wind-tunnel test.
Suspecting that the California High- Speed Rail Authority intentionally misled the state Legislature on costs, state Assembly Republicans are seeking to subpoena state documents on the estimated $68-billion high-speed-rail (HSR) project and set up a special committee to receive sworn testimony from CHSRA officials.
The Bureau of Reclamation and the California Dept. of Water Resources (CWR) offered additional detail to their revised plan to build a $15-billion water conveyance system in the Sacramento-San Joaquin Delta.