To build a new space that would house two iconic vehicles adjacent to the existing George H.W. Bush Presidential Library, the project team had to design and build a structure around an already displayed historical 268-ton locomotive that couldn’t be moved or touched.
This transformative, $46-million, 70,000-sq-ft facility elevates the campus’ fine arts programming with a 900-seat auditorium equipped with a fly loft, theater-grade sound and lighting systems, and a mechanically operated orchestra pit as well as tailored learning spaces for a range of fine arts disciplines.
The latest addition to Dallas Area Rapid Transit’s service is a 26-mile regional rail line that traverses seven cities and three counties with a final connection at Dallas-Fort Worth International Airport.
The Satterfield & Pontikes-led team relied on lessons learned fom past projects to successfully deliver the $179-million high school the Katy Independent School District.
For the Walbridge-led project team, delivering Ford’s 4.5-million-sq-ft BlueOval City auto manufacturing campus required "literally building a city and all its infrastructure.”