Only two of the four shortlisted teams chose to submit for the latest contract bid, which covers work to tie the new Hudson River tunnel into existing Northeast corridor rail service.
As the hospital system’s largest addition in more than 70 years, the seven-story, 379,000-sq-ft facility includes 26 operating rooms, nearly 60 pre- and post-operative rooms and 80 ICU beds.
Located on the same grounds as the 1968 HemisFair International Exposition, this project brings together historical references and environmental sustainability to realize a new outdoor public gathering place.
The facility now being built will function as a laboratory, training and office space for the state Dept. of Forensic Science and the Office of the Chief Medical Examiner.
Bechtel, Fluor, Turner Construction, North America’s Building Trades Unions, DPR, Kiewit, Clark Construction and Skanska execs aim to lower industry's craftworker suicide rate and boost mental health.
A 3.2-mile, fixed-span bridge with a 65-ft clearance and two 12-ft travel lanes will replace an aging swing span bridge prone to outages along a critical state route.