This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies By closing this message or continuing to use our site, you agree to our cookie policy. Learn MoreThis website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
The $25-million, two-story, 45,000-sq-ft Science and Student Life Center project at Sacred Heart High School is targeting and expected to achieve LEED for Schools platinum certification. The campus is situated on a private high school campus and includes a 700-seat assembly area, 300-seat cafeteria, kitchen and science classrooms. Related Links: Best of California 2009 The scope of the work presented an unusual situation where project engineers were assigned specific subcontractors to work with on procurement and installation when the trades had to work together. For example, in the assembly area, the advanced production equipment had to interface with the electrical,
The project at One Kearny consisted of $30 million worth of construction to renovate and revitalize, not only one but two, historic landmarks with a new addition. Scope included the demolition of an existing abandoned building and replacement construction of a 60,000-sq-ft, 10-story high rise, the historical restoration and seismic renovation of an existing 64,000-sq-ft, 12-story building constructed in 1902 and the modernization of the 1964 Charles W. Moore annex. Related Links: Best of California 2009 With no as-built drawings for the building constructed in 1902, areas were uncovered that the team had to immediately evaluate, making unforeseen obstacles a