Navigating noise issues, congestion and even the religious concerns of three Jewish congregations in the area, construction crews are performing surgery on a major artery in metro Atlanta in the second-largest project ever for the Georgia Dept. of Transportation (GDOT).
Inequities exist in all sectors—from highway alignments to industrial sites and wastewater treatment plant locations—but finding solutions won’t be easy or without controversy.
Workers with Kiewit Infrastructure Group race to stabilize a fractured tie girder that forced an indefinite closure of the key Tennessee-Arkansas crossing.
When the Norwegian Public Roads Administration asked the design-build team of Sweco, PNC, Armando Rito Engenharia and Isachsen to deliver a 643-meter-long concrete box-girder bridge completely in 3D, designers with Armando Rito were initially a bit skeptical.
Preparatory work is underway for a summer installation of a new concourse at Dallas-Fort Worth International Airport using prefabrication and modular methods—a first for U.S. airports, say officials.