At the King George the Fifth dock site on the River Thames, a contractor is using smart sensors to monitor the strength of concrete it’s casting to form 75,000 sq meters of slab over water to extend the footprint of London City Airport.
BNSF is planning to build a second railroad bridge over Lake Pend Oreille at Sandpoint that will be approximately 1 mile long, paralleling its existing bridge.
Contractors used a collaborative delivery method to inspire early and creative solutions for this Seattle building aimed at solving growing health issues.