A network of more than 50 transfer girders built atop an existing three-level underground garage carries the entire load of the 12-story radial residential building, located next to the historic Washington Hilton Hotel.
As part of an emergency program to alleviate chronic neighborhood flooding, a one-acre underground cell at the century-old McMillan Slow Sand Filtration Site was converted into a temporary stormwater storage basin.
Oregon Health and Science University, Portland State University and Oregon State University developed the Collaborative Life Sciences Building and Skourtes Tower in partnership.
The $10.8-million, 16,636-sq-ft expansion of the Tacoma Art Museum doubled the museum’s gallery space, making room for the new Haub Family Collection of Western American Art.
The $154-million first phase of the Northern Rail Extension in Alaska is the initial step in a multi-year effort to connect the towns of Fairbanks and Delta and the Fort Wainwright and Eielson Air Force Base military sites with Fort Greeley.
To create its transportation center and central kitchen, the Bethel School District—working with BNBuilders and Bassetti Architects—made programmatic design and campus layout a critical factor.