The 1.2-million-sq-ft Omni Nashville Hotel features 80,000 sq ft of meeting and event space—including ballrooms of 16,000 sq ft and 28,000 sq ft—and a 640-space, below-grade parking deck.
The PortMiami Wharves Strengthening project entailed the construction of 5,200 lineal ft of seawall to strengthen existing cargo wharves and allow for a future dredged depth of 50 ft.
For this project, Batson-Cook Co. performed multiple expansions and renovations across various sections of Cancer Treatment Centers of America's medical center in Newnan, Ga.
Building Streamsong Resort—a golf, spa and nature-based retreat located between Orlando and Tampa—involved transforming a former phosphate mine owned by The Mosaic Co., a producer of phosphate-based crop nutrients.
For Choate Construction Co., building the new corporate headquarters for the William Carter Co.—the children's clothing brand better known as Carter's—within 11 floors in Atlanta's Phipps Tower was an exercise in brand building.
The Beck Group was hired by the federal government to design and build an eight-story, 268,000-sq-ft office building to accommodate more than 1,000 workers on an existing high-security campus.