With fewer than 6 km left on the final Alpine drives, the $11.5-billion Brenner Base Tunnel shifts toward systems installation and a planned 2028 opening.
Students Martin Soros and Wes Buonerba said they applied backgrounds in civil engineering and architecture, respectively, to create the Gothic-style structure.