These days, Haim Haddad, owner of the Coney Island Beach Shop, plugs a tiny, square digital device into his cellphone or iPad to process credit-card payments.
Related Links: New York City Building Energy Use Report Called a Step toward Saving Energy Boston-based WegoWise, a building-performance analytics startup, says it was able to identify $137 million in lifetime energy savings in 2011 for buildings that are part of Mass Save's Low-Income Multifamily Program, which invests in energy-efficiency upgrades in low-income housing facilities across Massachusetts.The multiyear program is being implemented by the Low-Income Energy Affordability Network (LEAN) and the Mass Save sponsors—Massachusetts utility companies—that have used the WegoWise platform to track and benchmark energy and water use at more than 45,000 low-income multifamily units in the state. Barun
Nadine M. Post for ENR One New York Plaza was in the flood zone in Lower Manhattan. Nadine M. Post for ENR Related Links: Brookfield Office Properties While New York City's 100-person Building Resiliency Task Force—convened in the wake of Superstorm Sandy—begins reviewing codes to recommend ways to make low-lying buildings more flood-resistant, building owners are reassessing their own storm protocols. At least one, Brookfield Office Properties, already has begun rebuilding the three flooded basements of its 50-story One New York Plaza.The office tower sits near the southern tip of Manhattan. On Oct. 29, a 3-ft-high storm surge flooded three
ENR pointed its spotlight on some of the nation's most troubled infrastructure throughout 2012 with its ongoing Critical Infrastructure series, which chronicled how engineers are grappling with some of the biggest infrastructure challenges in a generation.
Related Links: U.S. Green Building Council International Code Council Though sustainability, modular construction and team collaboration dominated the news in the buildings sector in 2012, green building seems to be the topic most talked about. Every few weeks, it seems, green-building promoters issue guidance, model codes and digital tools to advance sustainable design and construction. Some say that green-regulation compliance is burying project teams in paperwork. Even worse, in a buyer’s market, owners keep dreaming up ways to put their design and construction teams at risk if the buildings do not meet energy targets. Though there has been some progress
It's official: The New York State Thruway Authority has chosen a $3.14-billion bid by Tappan Zee Constructors as the plan for the next version of the 3.1-mile-long, 57-year-old Tappan Zee bridge.
Courtesy of Synergy Thrislington A 200-member team broke the speed record in India by assembling the components of a steel-framed building in two days, working around the clock. Courtesy of Synergy Thrislington At the site, workers erected prefabricated floor subassemblies and other factory-built components. The builder claims that nearly 80% of the work was done in the factory. Related Links: Instacon Time-Lapse Construction Video Synergy Thrislington In just 48 hours, workers assembled the prefabricated structural-steel subassemblies and other components—without any interior finishes—of a 10-story building in the industrial town of Mohali in northwestern India. The still-unfinished building holds the nation’s