To expand offshore wind in Europe and reduce the cost of connecting turbines farther out to sea by cable as coastal locations fill up, TenneT, a major European transmission grid operator, is studying the feasibility of building a $1.8-billion man-made wind-farm island in the North Sea between the U.K. and Denmark—and maybe others.
A rubber safety screen falls away from a newly blasted rock at one of the many faces forming an 18-kilometer-long tunnel being built to divert traffic away from Sweden’s capital city.
Steel interests have misgivings about the fairness of a California law, enacted last month, intended to minimize carbon footprints of certain construction materials used in state-funded building projects by requiring all products to have a global warming potential less than the industry average.
At a time when the water treatment industry is facing some financial challenges, ENR takes a look at the 10 largest drinking-water treatment facilities in the world.
The construction, engineering and fabrication issues raised by Christopher Hartz and detailed here by ENR applied to both the Plant Vogtle and V.C. Summer nuclear expansion projects.
As private and public agencies
continue to restore power to the 70% of Puerto Rico that is still without electricity, the island’s government announced it will cancel a $300-million grid-reconstruction contract with Whitefish Energy.