As reports fly in Washington about White House plans for a $3-trillion economic recovery package, including a big infrastructure component, congressional committees are taking a more targeted approach.
The $500-million Academy Museum of Motion Pictures will raise the curtain this September on an eye-popping museum and theater complex that honors the past, is designed to resist future seismic forces and appears to defy the laws of gravity.
This design-build project created a 100-year stormwater system and reconstructed the city’s historic golf course “without taking up any additional land, given the urban environment.”
Returning a two-story section of a corner facade to its 1912 Beaux Arts look sounds simple enough: Remove the modern replacement and install a precast concrete replica of the original.
On the contrary, there was nothing simple about the elaborate storefront job.
The team tasked with completely rehabilitating an 8,500-ft-long, 150-ft-wide runway at Sacramento International Airport in just 6½ months not only did so on schedule, but also achieved a record industry standard for pavement smoothness.