Trinity University’s 40,000-sq-ft Dicke Hall is the school’s latest addition. The mass timber structure houses one- and two-tier classrooms, an auditorium, a screening room and student space.
Located at the heart of UT Arlington’s main campus is its newest facility, featuring a mix of classrooms; flexible and state-of-the-art technology; enriched learning spaces; teaching and research labs; faculty and staff offices; study and support spaces; and infrastructure support space.
After multiple additions and renovations over its 60-year lifespan, the original Bellaire High School was no longer able to support modern educational practices. Funded by Houston ISD’s 2012 Bond Program, the $122.9-million facility will support the community far beyond the next 60 years.
After three years of planning, budgeting and preconstruction, along with pandemic-related delays, the Avalanche Locker Room project was finally greenlit in February 2022.
To provide a new patient care unit for forensic services within the Memorial Hospital Central Emergency Dept. in Colorado Springs, crews performed a 3,400-sq-ft build-out of existing shelled space.
Flooding and other building damage from Superstorm Sandy in 2012 is a distant memory following capital improvements that included a 10-story addition, interior renovations, resilient power systems and a new 4-ft-high floodwall.
The Weitz Company, in a joint venture with Turner Construction, will lead construction of Phase 1A of the project to replace the existing terminal at Des Moines International Airport.