To replace the heavily worn I-5 overcrossing with a delaminated concrete deck at SW 26th Avenue in Southwest Portland, the project team had to navigate challenging site conditions, limited right-of-way, sensitive residential and environmental areas and difficult topography.
Completed on time and under budget in June 2024, this 87,750-sq-ft warehouse facility ensures Amazon customers in rural areas receive the same service level as those in metropolitan centers.
Renovating an active public facility while simultaneously constructing a mass timber addition demanded careful phasing and coordination to minimize disruptions and ensure safety.
Since the late 1980s, the Irish town of Arklow, about 90 minutes south of Dublin, has struggled to build a wastewater treatment plant, but delays and setbacks slowed development of a facility.
The project team faced a notable challenge—creating a modern mixed-use development that also embodied the design and atmosphere of a traditional Omani souq (market).
Located at the intersection of Pallisa and Kaliro districts in eastern Uganda, this project represents a significant stride forward for regional connectivity and socio-economic development
The Riva Residence Tower, a luxury waterfront high-rise located between Port Rashid and Dubai Dry Rocks, is the first architectural landmark within Dubai Maritime City.