The first new terminal in 40 years for the Washington State Dept. of Transportation-operated Washington State Ferries, the country’s largest ferry system, came with tricky site conditions and cultural significance that impacted both design and construction for a $187-million project split into multiple contracts to ensure on-time delivery.
The key new construction industry product resulted from a two-decade engineering push that culminated with a green manufacturing facility in Willows, Calif., a small town in the heart of the Sacramento Valley.
K-12 school in Cambridge, Mass., is the first school in the state to produce net zero carbon emissions and its largest net zero emissions municipal building.