Two existing seven-story office buildings have been transformed into combined lab and office spaces, creating 262,000 sq ft of Class A facilities designed to support life science and biotech firms on this 429,000-sq-ft campus in San Mateo.
Strategically located to signal arrival and welcome, this $85-million student services building creates a vibrant new entry experience for students and visitors alike to Evergreen Valley College.
Upgrading this 1.5-mile double-circuit electric transmission line over the Sacramento River in Rio Vista required construction of four new lattice steel towers from the ground up.
As part of a broader modernization strategy to increase renewable energy output and improve system efficiency, this project repowered an existing wind energy facility by decommissioning 23 outdated legacy turbines and replacing them with 19 advanced utility-scale wind turbines.
In downtown Burlingame, Calif., Swinerton Builders transformed a speculative office shell into a high-density, all-electric outpatient center for UCSF Health—one that compresses 100,000 sq ft of advanced clinical programming into a 50,000-sq-ft footprint.
Vibration and sound isolation, historic considerations and extensive below grade work are among the challenges in building Caltech’s quantum sciences hub
From cryogenics to lasers, vacuum chambers to superconductors, some of the most advanced research equipment available is necessary to explore quantum phenomena.
Planned 400-acre, $5-billion Pier Wind terminal at Port of Long Beach would gain $20 million to support fabrication, assembly and deployment of floating offshore wind turbines.
Joint venture to oversee construction management of California water district’s largest-ever capital project, reshaping Orange County's recycled-water system.