With about three-quarters of the U.K. high-speed rail’s 2.1-mile-long Colne Valley Viaduct complete, concrete deck segment placing crossed the country’s longest canal—the 137-mile Grand Union, about 20 miles from central London.
Panama’s 10-year, $5.4-billion effort to add a third set of locks culminated on June 9, as tugboats guided a 255-meter-long bulk carrier, named Baroque, into the first lock.
A series of demonstration projects, which will complete at the end of 2016, will set the stage for a project to restore water quality in more than 300 canals in the Florida Keys, with a conceptual cost estimate of between $300 million and $600 million.