ON DEMAND
As bridge designs become more complex, engineering teams face many challenges with limited project budgets and tight deadlines. Join us for an exclusive webinar as we share details of a prominent bridge design project executed by Arup. Discover how they delivered a fabulous bridge design on-time without jeopardizing quality. We’ll also share the best practices they learned from this one-of-a-kind project.
Key topics covered during this webinar:
- Achieving a higher level of detail (LOD 400) for improved drawing quality, minimized manual drafting, and prompt clarification of critical design issues
- Producing engineering drawings directly from the 3D model for dynamic changes in drawings and schedules (When the 3D model changes, drawings, and bar bending schedules are updated automatically)
- Ensuring interoperability between roadway design, bridge layout/modeling, and steel and rebar detailing with one federated system of files for reduced data translations and imports/exports
- Enabling downstream use of 3D model and digital data for fabrication and construction inspections
Sponsored by: