Built for The Taubman Co., the Mall of San Juan is a 640,000-sq-ft, two-level, enclosed shopping center that is Puerto Rico’s first upscale facility of its kind.
For the Georgia Aquarium’s Sea Lion Exhibit, contractors first demolished and removed an existing three-story concrete exhibit structure, selectively demolishing mechanical systems and cast-in-place concrete aquarium tanks while also removing theming, rockwork and acrylic glazing.
The Wayne County Board of Education selected the joint venture of Metcon/T.A. Loving as the construction manager at-risk for the simultaneous delivery of two positive energy middle schools.
Construction of this $3.4-million, 12,500-sq-ft educational center for Birmingham’s PreSchool Partners, a 501c3 organization dedicated to preparing at-risk 3- and 4-year-olds for kindergarten, marked the group’s first facility and enabled it to significantly expand operations.
The Tennessee Dept. of Transportation (TDOT) awarded Kiewit Infrastructure South a $62-million contract for accelerated bridge construction, or ABC, involving the demolition and reconstruction of eight bridges along Interstate 40 in Nashville.