Nearly 15 years in the making, St. Petersburg’s new pier offers 26 acres of interactive experiences culminating at a pier stretching more than 3,000 ft into Tampa Bay.
This Greenville, S.C., science center, part of the Greenville County School System, is intended to educate both students and the general public on how sustainable resources directly impact the local community and the county water shed.
When Hurricane Irma slammed into Tampa Bay in September 2017, it nearly destroyed a local historic elementary school in Tampa Heights—the city’s oldest suburb.
This project provides a new home for the Duke University Pratt School of Engineering’s education, research and entrepreneurship initiatives by bringing together faculty and students from various departments.
Situated in the heart of campus, the 176,000-sq-ft predominantly brick and glass double-tower structure is more than twice the size of the previous home of the College of Business.
Completed in just 13 months, this 94,000-sq-ft structural-steel high-bay hangar facility was built on a 232-acre site at the Brookley Aeroplex in Mobile, Ala., to enable aircraft manufacturer Airbus to better serve its U.S. airline clients.
To reduce the university’s energy costs while avoiding the capital expenditures needed to expand the existing energy plant’s cooling capacity, the design and construction team delivered a 3.5-million-gallon chilled water, thermal energy storage tank in May 2020.