The design-build team of Clark Construction Group and SmithGroup + HKS Joint Venture broke ground in August on the El Paso VA Health Care Center at Fort Bliss, Texas.
The 39-hour continuous installation of the 42-in. HDPE pipe is part of the larger Hampton Roads Sanitation District’s Boat Harbor Treatment Plant Conversion and Transmission program.