Realizing that software interoperability only represents the potential to pass data between differing software products and is not an end in itself, Bentley Systems Inc., Exton, Pa., has developed and is offering for free a set of workflow tools to help designers actually make good use of it. + Image The company announced on Jan. 27 that it is releasing free plug-ins that not only pass back and forth and back again models and tracked revisions within Bentley’s 3-D structural modeling program and two of Bentley’s analysis programs, but it also is giving away a plug-in for San Rafael, Calif.-based
JLG has reinvented the aerial work platform with its new LiftPod, which sets up in about 30 seconds, offers 14 ft of working height and weighs just 145 lb. Last month, ENR tried out the featherweight lift while it made a stop near Chicago as part of JLG’s national road show. Related Links: The New Ladder? Featherweight Lift Introduced last year, the LiftPod is McConnelsburg, Pa.-based JLG’s answer to short-to-medium ladders. It hauls easily in a pickup truck and has few moving parts. A 63-lb base, 49-lb mast and 33-lb basket comprise the basic unit; it can be assembled by
At an Oct. 14 conference in Charlotte, N.C., for power-users of 3-D design technology, executives and developers from Bentley Systems Inc., Exton, Pa., unveiled a tool they call an i-model, which they described as both an “elaboration” of a DGN file and as a “container” for encapsulating, circulating and re-incorporating 3-D design information and other project data of any format involved in a workflow of review and collaboration. Related Links: Containing Data: Dynamic Collaboration Unlike other 3-D model combining, viewing and reviewing tools, an i-model’s components retain their original geometric precision and “provenance,” or self-describing information about their formats, standards
Athird of the engineers surveyed in recent market research on building information modeling say they get a negative return on BIM investments; a fifth say they break even. The perceived return on investment for architects is better, with 19% saying they have a negative ROI and 23% saying they break even. BIM value for owners and contractors is perceived as much greater, at about 70% ROI. + Image Source: McGraw-Hill Construction “Engineers are the most pessimistic about the value of BIM, with 12% saying they see no meaningful value from it,” according to a market report, “The Business Value of
The majority of the focus within the telecommunications sector is on building data centers, the power-hungry, industrial-strength warehouse buildings with sophisticated MEP systems that house racks of servers and network switching gear. While the sector was impacted by the economic meltdown last year, with its share of project cancellations and lingering funding problems, it is poised to recover quickly and continue strong for the foreseeable future, say contractors and industry analysts, who paint a picture of a dynamic, rapidly evolving construction market with high growth potential. Photo: DPR Construction Despite a slight downturn in 2009, demand for data centers is
Paul Brugger, a scheduling consultant in South Jordan, Utah, got so frustrated a few years ago trying to work with massive schedules and enormous Gantt charts that he set out to build a better set of tools for comprehending them.
Oregon, which is implementing the first statewide electronic building permitting system in the U.S., is moving slowly ahead with system development, having recently enhanced its Website and added some services. But the 10-year program, funded by a 4% surcharge on permits, is at least a year behind schedule because of a significant drop in permit applications. Photo: The Los Angeles Department of Building And Safety Better software and improved interoperability are supporting the trend toward electronic permitting. For some states and most large jurisdictions, full-blown e-permitting, which includes digital filing, permit and plan tracking, plan review, payment, permit issuance and
For more than 30 years, the oil, gas and chemical process industries have successfully used virtual design and construction to ensure engineering and procurement specifications are in order, and all clashes are resolved before construction begins on the enormous, complex and expensive facilities the industry requires. But VDC, as a planning and construction management tool made necessary by the high stakes and great risks involved in the creation of the plants, turns out to be not enough. Plants are undergoing constant maintenance, refurbishment and change. Keeping on top of the activity and associated data is of vital importance to keep
Virtual design and construction tools are crossing over from buildings to transportation projects. Officials admit that 3D parametric modeling in the transportation sector has trailed the buildings sector, but they say change is afoot. “In 10 years, we will be living in a BIM world,” predicts Cosima Crawford, chief engineer for the New York City Transit Authority. “It’s our new reality,” she says.That reality has transportation teams tackling the same challenges their building counterparts are seeing in their transition to building information modeling. These include BIM technology issues, process change and institutional buy-in. Image: NYC Transit Authority For new projects,
Virtual design and construction is gaining ground in the utilities markets because of its ability to speed large-scale planning and development of energy projects. Though current applications on projects have just begun to touch the full potential of the approach, experienced users are enthusiastic about the financial benefits of debugging a project by building it first on the computer. Photo: Mortenson Mortenson uses VDC to layer environmental data, old-stump locations and grading plans for wind farm-site optimization. Photo: Bentley Bentley’s Substation V8i aids distribution planners with data modeling. Related Links: Digital-Modeling Veterans Want Data for Life Cycles Building Information Modeling