The U.S. Environmental Protection Agency’s drinking-water chief said the agency is preparing to issue a comprehensive action plan to address challenges to the nation’s drinking-water systems by the end of the year.
The contract involves the construction, with financing from Italy’s credit agency Servizi Assicuative de Commerce Estero, of the 2,200-MW Koysha Dam on the Omo River in the southern part of the country.
Panama’s 10-year, $5.4-billion effort to add a third set of locks culminated on June 9, as tugboats guided a 255-meter-long bulk carrier, named Baroque, into the first lock.
The U.S. Dept. of Justice, the U.S. Environmental Protection Agency and the Maryland Dept. of the Environment have proposed lengthening the current deadline for Baltimore to eliminate wet-weather overflows from its sewer system.
Water quality is the central issue in a dispute between state engineers and scientists over discharge from a planned $600-million Florida Everglades water-storage project.