Google’s need for a campus to match the growth of its engineering teams led to the creation of the five-acre Building D on the tech giant’s Kirkland, Wash., campus.
Onondaga Lakeview Amphitheater, an outdoor event complex, was part of a larger community revitalization initiative for the western shore of Onondaga Lake, the village of Solvay and the town of Geddes.
T-Mobile Arena is a $375-million venue for professional sporting events, concerts, awards shows and other high-profile entertainment along The Strip in Las Vegas.
To connect a 10-story addition to the San Francisco Museum of Modern Art’s existing five-story building, designers had to overcome significant geotechnical challenges.
New Zealand dedicated the $8-million Canterbury Earthquake National
Memorial, Christchurch, on Feb. 22, the sixth anniversary of the magnitude-6.3 quake that killed 185.
Revisions to UL Design No. D982 in the UL Fire Resistance Directory, based on recent fire tests, have heated up long-standing differences between structural-steel interests and fire-protection suppliers and installers about the amount of sprayed-on fire-protection material needed for structural-steel floor assemblies.
Hundreds of components of Victorian-era gasholders have found new life close to their original London home as enclosures for three new, high-end apartment blocks.