A union representing government engineers in Ontario is taking aim at a pair of newly released reports on the deck problem that temporarily closed the newly opened Nipigon River Bridge last winter, severing a major highway link between eastern and western Canada.
Despite adversaries’ strong opposition to a proposed 600-mile mid-Atlantic natural-gas pipeline on environmental, eminent domain and conflict-of-interest grounds, project developers late last month hired a four-firm team to build the estimated $5-billion project.
The problems have been piling up for Section 5 of I-69 in Indiana, a segment that involves 21 miles of upgrades to existing state Highway 37 from Bloomington to Martinsville.
Despite a force majeure port slowdown hampering the procurement of a Chinese curtain wall, German cabinets and Italian window-washing equipment, San Francisco’s 399 Fremont finished nearly two months early.
The team for Stanford University’s $438-million central plant replacement, designed to be 70% more energy-efficient, tiptoed around the 25,000 people who use the 8,000-acre campus daily.
Shanghai Construction Group ranks protecting the crews working 300 meters above grade and higher—especially while erecting the cantilevered steel structure and the curtain-wall bracing system—as the most challenging aspect faced during construction of the 632-m-tall Shanghai Tower.
The Dept. of Energy continued its campaign to halt construction of the multibillion-dollar Mixed Oxide Fuel Fabrication Facility project, often referred to as MOX, this time by pointing out construction errors and defects during a Sept. 8 media tour of the Savannah River Site facility.