This elementary school addition and remodel provides creative makerspaces for students and is equipped with learning studios and lab spaces to encourage hands-on discovery and creative thinking.
The project team that built outdoor retailer VF Corp.’s new downtown Denver headquarters came back together to deliver a fresh and fun look for the building’s interior spaces.
The new Pierce Park Elementary School replaces the Boise school district’s oldest elementary school, providing a 52,500-sq-ft facility that supports 400 kindergarten through sixth-grade students.
The city of Fountain wanted safer connectivity and traffic progression in a fast-growing part of town. As ground zero for a planned major residential development, the area also is a main route for both the school system and provides the only access to the regional landfill.
This freeway expansion project added a third travel lane in each direction along an eight-mile section of the toll road between Quincy Avenue and Interstate 70.
The College of Music at the University of Colorado Boulder is one of the country’s top public music programs. However, its facilities were dated, crowded and disconnected.
The new Denver Health Outpatient Medical Center increases the hospital’s patient capacity and provides advanced outpatient care while addressing the needs of a growing city.
This conversion of an abandoned dietary supplement production facility into a new headquarters for the Built Bar protein bar company required extensive demolition and remodeling to accommodate the company’s 300-ft-long production lines.
The city of Thornton’s 29,000-sq-ft design-build Fire Department Administration Headquarters includes offices, conference rooms, break rooms and work areas on the second floor, along with four large pull-through apparatus bays, 10 bunk rooms, a large dayroom and kitchen space, decontamination areas, locker rooms and an indoor-outdoor fitness center on the first floor.