Crews have begun building a replacement spillway at PG&E's Tiger Creek dam after statewide reviews reshaped flood risk assumptions, selecting an entirely new outlet system.
AI-driven power demands and a push to bring solar energy and other renewables online faster are driving the storage construction surge, with a record 24.3 GW starting up in 2026.
To repair and replace its aging sewer system, the City of Portland Bureau of Environmental Services has several programs running concurrently, including a small-diameter program, a bespoke Downtown–Old Town program and the large-diameter program.
Why is North Carolina receiving more than half of federal agency's latest $1.9B disaster funding package? The answer lies in Hurricane Helene's continuing recovery.
Project documents detail construction phasing at the Dry Dock 3 waterfront at Puget Sound Naval Shipyard and outline marine, dry dock, infrastructure and caisson contracts
As the U.S. Navy advances a planned $10-billion dry dock at Puget Sound Naval Shipyard, new documents reveal four major construction packages and phasing.