Cargo transfer operations at the Port of Long Beach are poised to become both greener and more efficient over the next decade with the $1.567-billion Pier B On-Dock Rail Support Facility.
Providing a 75-year design life for the structurally deficient critical link between the city of Chelsea, Mass., its northern suburbs and Boston, the rehabilitation of the Chelsea Viaduct involved night work with heavy equipment and posed many risks.
This exceedingly complex and challenging project provided a 75-year design life for the structurally deficient critical link between the city of Chelsea, Mass., its northern suburbs and Boston.
Hurricane Ida caused flash flooding of the Metro-North Hudson Line rail in September 2021, resulting in the partial collapse of the 100-year-old Wicker’s Creek culvert at milepost 21.16 and knocking all four tracks out of service.
For design-builders HNTB Corp. and Hensel Phelps to successfully deliver Tampa International Airport’s $326-million Blue Express Curbsides project—a first-of-its-kind facility for the U.S.—engineers and contractors would need to weave their work over, under, through and around buildings and other infrastructure comprising the tight, jam-packed jobsite located at TIA’s southern front door.