This project, which involved the construction of a rail car assembly facility, was delivered one month early and 8% under budget despite schedule constraints and the discovery of unsuitable soil.
Trumpf Smart Factory is a manufacturing and showroom facility designed and constructed to be at the forefront of integrated automation, material and information flow utilizing machine tools.
Mill 95 is the first operation of its kind in Idaho: a hops-processing facility that brings local farmers and brewers together and keeps the manufacturing of hops pelletization in the state.
The Ogden facility is Home Depot’s first drive-through warehouse, which allows for safer truck loading and unloading without drivers having to work around warehouse employees or products.
Cooperation among the designer, owner and construction manager allowed this $33.9-million project to reach substantial completion ahead of schedule and under budget despite converting a structure designed for commercial office and warehouse use into a manufacturing facility.
To build one of the largest single data center structures in Data Center Alley, the team had to adhere to the client’s tight deadline, making the integration of design and construction processes critical.
Hurricane Harvey made landfall on the Texas coast just weeks after the building shell for Lonza Houston Inc.’s 265,000-sq-ft facility in Pearland was completed.
Foxconn Technology Group confirmed it has selected Gilbane Building Co. of Providence, R.I., and Germany’s M+W Group as the joint-venture general contractor for a $10-billion LCD screen manufacturing facility planned for Mt. Pleasant, Wis.
According to several sources close to the project, Rhode Island-based Gilbane Building Co. has been chosen as general contractor for the 22-million-sq-ft, $10-billion flat-screen-panel manufacturing campus to be built by Taiwanese electronics maker Foxconn in Mt. Pleasant, Wis. Gilbane.