As part of the nine-year, $1.62-billion Port of Long Beach Middle Harbor Redevelopment Program, Arcadis provided full construction management services under a five-year, $31-million contract for Phase 1.
The design-build team of Hensel Phelps and Fentress Architects delivered the first air traffic control tower to employ a performance-based seismic design with vertical post-tensioning.