The Memorial Sloan Kettering Bergen Cancer Center transformed a 50-year-old steel-frame office building into a 140,000-sq-ft cancer diagnostic and treatment center—with extensive upgrades to support high-end X-ray and imaging equipment, two linear accelerators, and an array of exam, infusion and treatment suites.
Orlando, Fla., approved Ponte Health’s site plan and initial designs for its $1-billion Vertical Medical City project in downtown Orlando, the Orlando Sentinel reported.
Renovating four floors of a former abandoned mill to create a much needed medical facility in downtown Lowell involved extensive remediation and challenging logistics, the team says.