The $23.6-million Lakeville Interchange project widened the southbound overcrossing for Highway 101 and Route 116, replaced the northbound overcrossing and reconstructed ramps, retaining walls and soundwalls.
Stretching 7.5 miles from San Bernardino to Riverside, this project closes a gap in high-occupancy vehicle (HOV) lanes on Interstate 215 between the busy I-10 and I-605 freeways, giving Southern California 500 miles of continuous HOV lanes.
The first ground-up bus operations and maintenance facility for Los Angeles County Metropolitan Transportation Authority in nearly 30 years, this 540,000-sq-ft sustainable facility is designed to optimize Metro’s bus transit service throughout Central Los Angeles and accommodate 200 buses fueled by clean natural gas.
The Exposition Light Rail Transit Phase 2 in West Los Angeles is a textbook case in how to maneuver through major city arteries, say Best Projects judges.
As part of the nine-year, $1.62-billion Port of Long Beach Middle Harbor Redevelopment Program, Arcadis provided full construction management services under a five-year, $31-million contract for Phase 1.
The design-build team of Hensel Phelps and Fentress Architects delivered the first air traffic control tower to employ a performance-based seismic design with vertical post-tensioning.
The new LBJ Express, a 13-mile-long, $2.7-billion P3 project, crosses two municipalities within Dallas County, Texas, and doubles the existing capacity of the highway corridor, one of the busiest in the nation.