To reduce project cost and schedule length while addressing the skilled labor shortage, many owners and contractors are moving work from the construction site to a fabrication facility.
The proposed bypass fix for the troubled Fremont Street girders of San Francisco's Salesforce Transit Center calls for bolting 20-in.-wide steel cover plates above and below the fractured bottom flange, like a double splint.