While 45-miles of natural gas pipeline affected by a Sept. 13 gas explosion will be replaced nearly three weeks early, the restoration of full gas service will be delayed by about a month.
The renovation, relocation and expansion of surgery and surgical support areas at Primary Children’s Hospital encompassed 40 phases and included six new operating-room suites, labs, pre-op and post-op units, pharmacy, clinical engineering, central processing and units for post-anesthesia care and minor procedures.
The 58-story Millennium Tower in the Transbay district of San Francisco, which has sunk 18 in. and is tilting 2 in., is under even more scrutiny for possible structural defects since a window on the 36th floor cracked.