Stabilizing a quarry where rockfalls threatened to crush critical infrastructure under construction demanded a meticulous approach and required workers to rappel slopes to remove loose material. At a cost of less than $500,000, the design-build project involved an outer highwall corner stabilization for a primary crusher station, mitigating rockfall along the conveyor near the highwall and the installation of six micropile caps to structurally support the dump ramp deck.