What Engineers and Artists Can Learn From Each Other With Edgar Westerhof and Sarah Cameron Sunde | Engineering News-Record
Home » Multimedia » Podcasts » ENR Critical Path Podcast » What Engineers and Artists Can Learn From Each Other With Edgar Westerhof and Sarah Cameron Sunde
ENR's Critical Path Podcast
ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.
ENR editors Pam McFarland and Corinne Grinapol sat down with the husband-wife team of Edgar Westerhof, vice president and U.S. climate adaptation lead at Arcadis and Sarah Cameron Sunde, an artist working at the intersection of performance, video, conceptual and public art, to talk about climate adaption, water, and art.
Westerhof has been an integral part of the Big U and East Side Coastal Resilience Project in New York City, and Sunde is cofounder of the triennial Works on Water, a 2021 Guggenheim Fellow, and a 2023 cultural leader with the World Economic Forum.
Image: Sarah Cameron Sunde's 36.5 / New York Estuary, 2022. Screenshot from the video work (12h39m). Courtesy of Sarah Cameron Sunde Studio.
At an industry symposium in June, Deputy Editor Aileen Cho interviewed three key leaders of the global insurance broker, including Rob McDonough (pictured), CEO of Construction, Infrastructure, and Surety for North America.
When construction abruptly stopped at the former Pfizer headquarters redevelopment in Midtown Manhattan after workers discovered buckled steel columns and floor sagging, public attention quickly turned to one question: What happened?
But before investigators can determine why a structural failure occurred, engineers must answer a different question: How do they stabilize a damaged building and safely determine what went wrong?
In this special edition of the ENR Critical Path Podcast, host Bryan Gottlieb speaks with Christopher Raebel, vice president of engineering and research at the American Institute of Steel Construction, about the engineering response to structural emergencies.
Rather than speculate about the ongoing investigation, Raebel explains how engineers assess structural damage, stabilize compromised buildings, investigate potential causes and determine whether damaged structures can be repaired.
Whether you're an engineer, contractor or simply curious about how complex structural emergencies are managed, this conversation offers an inside look at the process that begins long before investigators reach their conclusions.
Polysiloxane coatings are redefining long-term protection for water storage and treatment assets. In this episode, learn how these advanced systems outperform traditional epoxy and polyurethane coatings with superior UV resistance, durability and reduced maintenance needs. Explore how the smooth, non-porous surfaces of polysiloxanes help minimize biofilm and algae growth, supporting cleaner assets and improved water quality. You’ll also gain insight into lifecycle cost savings and why utilities and operators are turning to polysiloxanes as a smarter, more sustainable solution.
Speakers: Steve Roetter, Market Segment Manager for Water Infrastructure
With more than 40 years of experience in the water and wastewater industry, Steven helps customers solve their most critical asset protection challenges as a Market Segment Manager for Water Infrastructure for Sherwin-Williams Protective & Marine.
Charles Kucherka, Principle, Treatment, Transmissions and Utilities – Central Division
As a Principal at Freese and Nichols, Charles is the engineering and environmental services firm’s senior technical professional in water storage tank design, rehabilitation and coatings.
Alquist 3D Chariman and Founder Zach Mannheimer talks to ENR Senior Editor Jeff Yoders about housing, the journey of 3D printing concrete homes and commercial products and how his company made additive manufacturerd Wal-Mart Supercenters.
In a multimedia podcast, the CEO of GISI Consulting Group discusses how the collective utilizes a roster of A-list firms under one platform, with 10,000+ employees advising on megaprojects across the globe.
What does it take to build a lasting career in construction? Three senior women leaders from J.E. Dunn, Austin Industries, and Findorff share hard-won perspectives on resilience, navigating burnout, and earning a seat at the table.