The Pennsylvania Turnpike Commission is jumping into accelerated bridge construction (ABC) with both feet, tackling replacement projects scheduled at opposite ends of the Keystone State over the next two weeks.
To create Blox’s stacked box profile “hovering over the road,” many trusses are needed to transfer loads around spaces varying from apartments to a 200-seat auditorium.