Under the radar, behind the project gate, inside the executive suite. That's where ENR's editors and bloggers deliver their insights, opinions, cool-headed analysis and hot-headed rantings.
What did construction, transportation, energy and labor groups have to say about the State of the Union address? Plenty. That's no surprise, given President Obama's comments about infrastructure, energy and housing. Here's a sample of the reactions.
Some contractors think it looks like the Batmobile. Others say it's a medieval torture device. Either way, the Phoenix slipform curb machine is turning heads in Las Vegas.
ASHRAE has polished its image in a way to communicate its commitment to high-performance buildings, not just heating, ventilating, refrigerating and air-conditioning systems.
The housing downturn badly hurt the market for concrete transit mixers, but vendors are drawing up new battle lines in preparation for an economic rebound.
Recent Comments
A heartfelt and powerful message
https://syedconsultancy.com/
Congratulations Kyle!
Construction Burnout
Construction burnout