After first approving the city's flood repair cost at $1.1 million, the federal emergency response agency later said it was only entitled to about $200.
The bridge received almost $400 million from the federal Bridge Investment Program, with Tennessee and Arkansas splitting the remaining $787.5-million cost.
Brasfield & Gorrie was able to safely execute simultaneous construction of a 26-story office tower, 26-story residential tower and 14-story hotel on a tight site in urban Atlanta.
Planning and constructing a 128-ft-tall, 139-ft-long, 62-ft-wide, 2,800-ton cracking furnace, then transporting it a mile before carefully connecting it was a puzzle that took some out-of-the-box thinking and next-level coordination.