Top 100 Project Delivery Firms saw demand for design-build and construction management-at-risk delivery methods increase by 11% and 13.4% respectively last year, reflecting what firms say is a drive toward greater project collaboration.
The $440-million Linden Renewable Natural Gas project will divert food, scraps, oils and grease from landfills and capture methane inside large anaerobic digesters to create 3,783 million BTUs per day of pipeline-quality renewable natural gas.
With 35 major infrastructure projects scheduled over the next 10 years in the region, I-35 will be the backbone of a multi-agency collaboration through a bidirectional construction data platform.
Confusion over the Trump administration’s “America First” agenda and rising construction costs drive company execs to shift resources toward innovative solutions.
A design-build JV of Dragados USA, Vinci, Dodin Campenon Bernard and Flatiron Constructors is leading the $3.9-billion project, which will double capacity with two new 7,900-ft-long bored tunnels.